The following work was accomplished last week:
  • Foundation excavations and concrete pours continued.
  • Demolition of the utility service poles along the former Parker Street was completed.
  • Final connection of the temporary sanitary line to the existing building was completed.  This completes the relocation of all utilities to the existing building.
  • Drilling for the geothermal wells continued.
  • Installation continued of the underground storm water system at the north end of the site.
  • Installation of the protective walkway along the front of the building was completed.
 Work anticipated this week:
  • Lighting will be installed in the protective walkway.
  • Geothermal well drilling will continue.
  • Foundation excavations and concrete pours will continue.
  • Installation will continue of the underground storm water system at the north end of the site.

Upcoming Events

Charter Oak International Academy

425 Oakwood Ave., West Hartford, CT 06110

Juan Melián, Principal

T: 860-233-8506

F: 860-231-9654

email page print page small type large type
powered by finalsite